Recent project
Battersea Power Station – Switch House East
Project brief
Battersea Power Station is a £9bn high profile regeneration project.
Switch House east is one phase of the redevelopment which is situated within the actual power station itself.
Imtech are the M&E subcontractor and they awarded us the contract for the residential fire sprinkler system to protect all 126 apartments, entrance lobby and reception area.
We also supplied and installed four wet riser fire mains within the firefighting cores of the residential towers.
Project Details
Client
Imtech Engineering Services
Location
London
Date
2019
Value
£263k
Arrange a free quotation
+44 (01424) 812 557
info@trianglefiresystems.co.uk