Blog
On the 4th September there was a successful sprinkler activation at an apartment on the 11th floor of the 54 storey Wardian East Tower.
The fire broke out in the kitchen when the occupant was cooking with oil. The sprinkler head nearest the fire activated and successfully suppressed the fire until the fire brigade arrived. There was minimal smoke damage and some water damage to the flooring.
Our engineer was in attendance within 30 minutes of us being notified of the fire. Once on site the engineer replaced both the sprinkler head and cover cap, and reinstated the system back to full operational use.
Fire Door Safety Week
Blog The British Woodworking Federations' Fire Door Safety Week aims to raise the awareness of the critical role that fire doors play in saving lives and protecting property in the unfortunate event of a fire. The theme for this year's campaign, which runs from 25-29...
College Road Site Visit
Blog Last week, members of our Hastings Office, from the Accounts, Estimating and Design teams, went on a site visit to Tide Construction project, College Road. This is one of the most prestigious projects that Triangle have worked on, once complete it will be the...