Blog
On the 4th September there was a successful sprinkler activation at an apartment on the 11th floor of the 54 storey Wardian East Tower.
The fire broke out in the kitchen when the occupant was cooking with oil. The sprinkler head nearest the fire activated and successfully suppressed the fire until the fire brigade arrived. There was minimal smoke damage and some water damage to the flooring.
Our engineer was in attendance within 30 minutes of us being notified of the fire. Once on site the engineer replaced both the sprinkler head and cover cap, and reinstated the system back to full operational use.
Sustainable Welfare Unit Trial
BlogTriangle have been awarded the contract to provide design and retrofit sprinkler installation at Sherratt House, a 7 storey building, comprising of 25 flats, owned by Guinness Partnership. Carbon reduction, environmental footprint and having a positive impact on...
Triangle Secure Contract on the World’s Tallest Modular Building
BlogWe have secured the contract for the commercial and residential sprinklers and wet riser at Tide Construction project, College Road. The College road development consists of 817 co-living rental homes and 120 affordable residential units across 2 two towers of 35...