Blog
On the 4th September there was a successful sprinkler activation at an apartment on the 11th floor of the 54 storey Wardian East Tower.
The fire broke out in the kitchen when the occupant was cooking with oil. The sprinkler head nearest the fire activated and successfully suppressed the fire until the fire brigade arrived. There was minimal smoke damage and some water damage to the flooring.
Our engineer was in attendance within 30 minutes of us being notified of the fire. Once on site the engineer replaced both the sprinkler head and cover cap, and reinstated the system back to full operational use.
Triangle Secure Contract on the World’s Tallest Modular Building
BlogWe have secured the contract for the commercial and residential sprinklers and wet riser at Tide Construction project, College Road. The College road development consists of 817 co-living rental homes and 120 affordable residential units across 2 two towers of 35...
ISO 14001: 2015
BlogTriangle Fire Systems are proud to have achieved ISO 14001, this accreditation highlights our commitment to consider our environmental impact across all areas of our business. Having achieved ISO 9001 accreditation in 2016, the next natural step for us, as an...