Blog
On the 4th September there was a successful sprinkler activation at an apartment on the 11th floor of the 54 storey Wardian East Tower.
The fire broke out in the kitchen when the occupant was cooking with oil. The sprinkler head nearest the fire activated and successfully suppressed the fire until the fire brigade arrived. There was minimal smoke damage and some water damage to the flooring.
Our engineer was in attendance within 30 minutes of us being notified of the fire. Once on site the engineer replaced both the sprinkler head and cover cap, and reinstated the system back to full operational use.
BGF x Havas Media Network – Marketing Summit
BlogOn Tuesday 10th September, Triangles marketing team went to London to attend the BGF strategic marketing summit which was hosted in partnership with Havas Media Network. BGF is a company that addresses the SME funding gap in the UK, they now have a portfolio of...
Literacy Trust: Dream Big
BlogThe National Literacy Trust is marking its 30th anniversary this year. Throughout these three decades, they have been dedicated to empowering families and children, transforming lives through the influence of literacy. Moreover, during this 30-year period, the...